USE Hickson Products Ltd.
USE Hickson Stamp
 

Related Products

Acryli-Bond

Wood Repair
Wood Repair
Concrete Crack Filler
Concrete Resurfacer
E-Z Flow Patching Cement
Wood Repair
Wood Repair
Foundation Insulation Coating
Glass Block Mortar
Instant Patching Cement
Instant Post Cement
Instant Waterstop
Mortar Fix
Wood Repair
Wood Repair
Premium Concrete Repair
Ready Mix Concrete Patch
Wood Repair
Wood Repair
Surface Bond Fibre Cement
Wood Repair
Water Proof Cement
Water Proof Cement
Water Proof Cement
Wood Repair

Vinyl Cement Patch

Black Knight

Wolman

 

 



INSTALLATION GUIDE


SURFACE PREPARATION:
Remove all loose dirt, oil, dust, grease and other contaminents so as to expose a good, clean, sound surface. For wood floors ensure any loose flooring is tightly nailed down and support is sufficient, that there is no excessive deflection under normal loads. Apply E-Z Flow Primer 100 by using a roller or soft bristle brush on to the surface area and allow to dry completely.

MIXING: Mix 4.5L (4.5 qts.) of clean water to 22.7 kg (50 lbs.) of E-Z Flow Concrete Floor Underlayment while mixing. A power mixer is recommended. let stand for 2 to 3 minutes, remix and add more water if needed to obtain a lump free flowable mixture. Do not over water; over watering will cause discoloring and bleeding. Do not over mix.

APPLICATION: For small installations, mix E-Z Flow powder and water in a five gallon pail using a 1/2" heavy duty drill with a Turbine Mixer or similar mixing paddle. Place the liquid E-Z Flow Floor Underlayment by pouring directly from the mixing container. If needed spread material in place with a spreader. E-Z Flow Floor Underlayment will continue to be flowable during the first 15 minutes after mixing. For larger installations, mix 2 bags at a time in a mechanical mixer. E-Z Flow Floor Underlayment can be pumped to installation area. (Contact manufacturer for pump recommendations). E-Z Flow Floor Underlayment can be installed from featheredge to a thickness of 2.5 cm (1") in one operation. For areas of greather thickness it is recommended to mix the E-Z Flow Floor Underlayment with washed peagravel 6mm (1/4") in size. Mix E-Z Flow Floor Underlayment with water first, then add peagravel. Use 10 kg (22 lbs.) of peagravel per bag. If aggregate is wet, reduce the amount of water to avoid overwatering. If peagravel is not available, then E-Z Flow Floor Underlayment can be applied in a series of 2.5 cm (1") pours until the desired thickness is obtained.

CLEANING: Clean with water as soon as possible after application.

WISE TIPS

  • If substrate is moist or wet due to hydrostatic pressure, Stone Mason Waterproof cement should be applied to seal out moisture prior to application of primer.
  • Porous surfaces will require 2 coats of primer to avoid pinholes, bubbles and improve flow properties of EZ Flow Underlayment.
  • A 1/4" minimum thickness of material is recommended with the exception of feather edged areas.
 


Jump To:
Copyright © 2002, 2003 U.S.E. Hickson Products Limited